Author Archives: admin

Byadmin

Consultancy required for training of institutional development component staff of PPR Project

Consultancy required for training of institutional development component staff of PPR Project on (ToT) on Social Mobilization and implementation strategy.

For participatory development announcement
Apply before 20 th April 2016

Announced on : 01 th April 2016

Apply before: 20 th April 2016

Click here to download ToRs

Byadmin

Consultancy Required for Community Management Skills Trainings

Consultancy required for,Community Management Skills Trainings for community Organization at District Panjgoor.

Announced on : 20th March 2016

Apply before: 25th March 2016

Click here to download ToRs

Byadmin

Consultancy Required for Training of community members on Peace

Consultancy required for,Training of community members on Peace, Pluralism and Harmony
Click here for Details.

For Participatory Development Announced on 15th March 2016
Apply before 20th March 2016
Click here to download ToRs

Byadmin

Programme for Poverty Reduction (PPR)

Funded By: Pakistan Poverty Alleviation Fund (PPAF)

Project Location: District Panjgoor

Project Description:

The three year investment program “Poverty Reduction through Rural Development in Balochistan, KP & FATA” to be financed by the Government of Italy (GoI) through the Directorate General for Development Cooperation (DGCS) aims at contributing to poverty reduction in selected districts for the population of Balochistan, Khyber-Pakhtunkhwa and Federally Administered Tribal Area (FATA). These provinces bordering with Afghanistan are suffering from poverty, as well as from distress and have to be considered amongst the most vulnerable areas of the Country the objective of this program are as under

  • Population poverty reduction through the creation of sustainable conditions of social and economic development, including income and production capacity increase

1

Byadmin

Integrated Maternal Newborn and Child Healthcare

Funded By: Save the Children

Project Location: District Ziarat

Project Description:

The main purpose of project is to improve maternal and newborn health care in selected communities through viable and demonstrable initiatives. Project Goal is to improve the coverage and quality of maternal, newborn and child health care services in selected district in Balochistan province”, with the Objectives of;

  • To carry out community outreach and social mobilization, campaigns, BCC activities in LHWs uncovered areas in the targeted districts of IMNCH for sustainable change.
  • To build up referral linkages of communities and secondary level health facilities and also coordinate with health facilities to further link the follow up cases into HFs.

30

Byadmin

Long term Election Observation & Oversight Program

Funded By: Trust for Democratic Education & Accountability (TDEA)

Project Location: District Kharan, Washuk, Panjgur, Gawadar and Kech.       

Project Description

The overall objective of the TDEA-FAFEN strategy is to strengthen democratic institutions in Pakistan by contributing to transparent and accountable electoral processes. Free and fair elections are a vital element of democratic processes. The freedom and fairness of elections are not confined to Election Day. All aspects of the electoral cycle contribute to the freedom and fairness of elections and the democratic process as a whole. TDEA-FAFEN is implementing a long term observation programme as part of its overall election observation methodology, encompassing the monitoring of both pre and post electoral processes.

29

Byadmin

Strengthening Formal Education In Refugee-Affected And Hosting Areas

Funded By: UNHCR

Project Location:  District Pishin

Project Description:

The Project is aimed to strengthened formal education in UC Ajram by improvement of missing facilities in schools of refugee-affected and hosting areas.

28

Project Results and Deliverables

  • Functional PTSMC in 7 schools supporting the students in refugee affected communities at the end of the project
  • Support of the communities (all tribe Afghan- Pakistani) to the targeted schools
  • Specific, tangible and ongoing support from local government/ administration of the 4 government schools in the target area by the end of the project
  • Support for education department in monitoring the facilities provided by the project in 4 target schools from refugee affected and hosting area
  • 8 teachers are provided with teacher training e.g. good teaching Methods, joyful learning, child friendly school concept by the end of the project in target area
  • Improved infrastructure and environment of 6 schools with increased enrollment of girls in the target areas by the end of the project
  • 530students and 7teachers provided with clean drinking water and hygienic sanitation facility
Byadmin

Adult Literacy Centers funded by Social Welfare Department Govt Of Baluchistan

Project ID: 01-2009 / 2010

Funded By: Social Welfare Department Govt Of Baluchistan

Project Location: District Kill Abdullah

Description of the Project:

Youth Organization conducted the trainings for the adults of Killa Abdullah, and established community based formal schools which had a strong impact on the Community adults.

Output:

  • 16x Adult Literacy Centers were established.
  • 1300x adults have been trained on adult literacy concept.
Byadmin

Rehabilitation of Karez and providence of Safe drinking Water and Irrigation System

Funded BY:  GIZ International

Project Location: District Pishin

Description of the Project:

The Project is aim to support local community of Sanzala karez to improve the management of scarce water resources by reducing the overall impact of the present water crisis in the project area. The provision of permanent infrastructure will improve system efficiency by reducing losses and conveyance times between the source and outlets.

27

Byadmin

Enhancement of Existing Dam & Tree Plantation

Funded BY: UNHCR/RAHA

Project Location: District Pishin

Description of the Project:

The proposed project is designed to meet the needs and demands of targeted community. The proposed community is a mix of local hosting and refugee population, where on one hand the refugee are vulnerable due to their refugee status and on other hand merge resources of the host community are exhausted due to hosting refugee since last 30 years.  Following were the outputs of the Project.

26

Hard Component:

  • Rising and improving the embankment of existing dam.
  • Making the spillway of existing dam.
  • Stone pitching of upper side embankment of dam.

Soft Components:

  • Community Organizations Formed
  • Health & Hygiene Sessions conducted
  • COs Training arranged